Technologies
25 KV AC
Third Rail
TSS
SCADA
High Mast
Services
- Site feasibility analysis.
- Layout plan/ SIP/ BOQ/ GFC
- Detailed engineering plan.
- Drawings and Documentations.
Design and Feasibility Engineering
Civil Work
- Earth work, embankment & blanketing formation
- Bridges
- Track laying and Linking (Ballasted and Ballastless)
- Pitline and drainage.
- Associated buildings and structures.
- Overhead Electrification with 25 kV traction.
- Third Rail.
- SSP/ TSS
Electrical Work
Signaling Work
- PI/PRI/SSI/CBTC/ETCS
- Indoor Work.
- Cabling.
- Outdoor Work.
- Testing and Commissioning.
- Exchange server installation.
- Optical fiber installation.
- Indoor Work.
- Outdoor Work.
- PAS/PIS
- CCTV
Telecom Work
Supply chain and Quality assurance
- Procurement.
- Statutory Approvals.
- Transportation.
- Inspection & Certification
- QAP as per India & International accepted standards. (IS, IEC, ISO, SIL – 324)
- Testing and Commissioning of all components.
- Performance test.
- Trial run.
- Final handover.
- DLP Servicing.
Integration of Rail Works
Projects
Head Office
Reach Us
ETOE TRANSPORTATION INFRASTRUCTURE PVT LTD
#20, 10th Floor Sattva Galleria, Kashi Nagar, Bellary road, Bangalore Karnataka 560092